Hi we have just made some calls about internet connection been told we have to wait for 6 months before we can apply is this so, we can just have telephone line only,
Hi we have just made some calls about internet connection been told we have to wait for 6 months before we can apply is this so, we can just have telephone line only,
Applied for 176 visa 23/03/2011 C/O 19/04/2011. Meds done 18/05/2011 Police Checks sent 16/05/2011. Visa Granted 26/05/2011. Flights Booked 12/01/2012.
| | |
Lisa Nurse at Flinders, Gareth Disability support assistant, Adam (16) Ethan (12) Academic Ielts 20/3/10, ANMC skills ass 11/8/10, SA SS 3/3/11, 176 lodged 10/3/11, Pcc 11/4/11, Medicals 5/4/11, Ethans referred 27/4/11, Visa granted 6/5/11, Arrived in Adelaide Oct 2011 and loving it!!!
Got ours all up and running just under 2 weeks after moving into our house (Adam internet with VoIP phones)
Jane and Clive
CPV 143 - Feb 2010 Acknowledged 3rd May 2010, VISA GRANTED 3rd June, 2011, Arrived 5th October Moved to new house 18th November Living the dream!
We are with Adam took just over a week to connect and that was this time last year during the holiday, got a large download limit and VOIP which is so much cheaper for calling home.
That sounds very strange! We ordered a phone and internet package with Optus online, didn't even have to speak to anyone. Was installed about 2 weeks later. I can't imagine why Telstra would be difficult but I'd say it's a sign they don't want business so just shop around!
OH's front loaded application (309 visa) received at AH 13/04/2011. CO assigned 20/04/2011. Original documents returned 26/04/2011. Visa approved 11/08/2011! Arrived in Adelaide 3/11/2011:)
I think Telstra have a reputation for being difficult, it doesn't bode well if they can't even get you connected! I would go elsewhere if I were you.
ADAM are the better option in Adelaide as they are locally based and you get humans on the tech helpline if required. I've been with them for 7 years and all problems I've encountered have been easily solved.
We bought a wireless dongal pay as you go over the counter up and running in the hour, yhe down load you get depends on the amount you pay $30 to $150 from 30 days to 12 mounths. Ok but can be costly.
JIM&NIC
JIM, A/C engineer. NIC, JEMMA, 15.JAMES, 10.
WAITING ON SELLING THE HOUSE
ACCEPTED OFFER 10-06-11
HOUSE BACK ON THE MARKET
ACCEPTED OFFER 4-7-11
HOUSE BACK ON THE MARKET
ACCEPTED OFFER 12-7-11
Sold and moved out 2/9/11
FLIGHTS BOOKED 18/10/11
ARRIVE 20/10/11
ALDINGA BEACH HERE WECOME
MOVE TO SEAFORD MEADOWS 12 MTHS RENTAL
We got the whole package with telstra, foxtel, landline, mobiles, internet with bigpond, all in 2 weeks. Everything was up and running within the first week of moving into the rental.
It doesn't sound right to have to wait so long.
Check again, or shop around.
| |
Bookmarks